Hi,
It would be interesting to have several levels to assign a due date.
1st level
In the general parameters (the solution exists)
2nd level
In the product engine, if activated, this level is selected. Some default products may have a different production time.
2nd level + Options
Options in the product engine interact on the due date.
For example, we have an aluminum panel with a default due date of 5 days, the option of a varnish adds 1 extra day to the due date because it takes longer to produce this job.
Another example, we could assign the product a due date of 0 day.
A production time option with margins defined on the price would interact on the due date in order to sell correctly according to this due date.
Normal Production in 5 days > +5
Fast Production (in 3 days) > +3
Express Production (in 1 day) > +1
Thomas,, I like this concept. let us review and discuss it internally. I may reach out at some point to get more on this if you don't mind.